Healthcare2025
Summertown Medical Centre
Refurbishment of a working GP surgery in Oxford
Full refurbishment of a working GP surgery, phased across nine consulting rooms without closing the practice.
Refurbishment services
Project facts
- Client
- NHS primary care partnership
- Location
- Summertown, Oxford
- Contract type
- Traditional, JCT Minor Works
- Contract value
- £980,000
- Consulting rooms
- 9
- Programme
- 22 weeks
- Completed
- April 2025
01 — The brief
Refurbish it without closing it
Nine consulting rooms, a treatment room and the whole reception needed stripping back and rebuilding, in a practice that could not stop seeing patients for a single day.
Closing the surgery would have moved eleven thousand registered patients to practices already at capacity. The programme had to absorb that constraint rather than ask the client to.
02 — Delivery
Two rooms at a time, behind a sealed wall
Work was phased in pairs of consulting rooms, each pair sealed behind a temporary partition with its own negative-pressure extract and its own entrance from the rear car park.
Noisy work was booked into the practice’s protected learning afternoons, agreed a month ahead against the clinical rota. Dust monitoring ran continuously on the patient side of every partition.
- Nine rooms rebuilt in five phases
- Negative-pressure dust containment
- Separate contractor entrance
- Noisy work booked to the clinical rota
- Continuous dust monitoring
- No clinical sessions cancelled
03 — The outcome
Not one cancelled session
FF Construction completed the £980,000 refurbishment of Summertown Medical Centre in April 2025, across 22 weeks, without the practice cancelling a single clinical session.
All nine consulting rooms, the treatment room and reception were handed over in use. The practice has since commissioned us for its branch surgery.
Gallery
Building around a full waiting room

Temporary partitions sealed each pair of rooms from the practice. 
The rear car park entrance kept site traffic away from patients. 
A completed consulting room, handed back in use.
Related projects
Other healthcare and refurbishment work
All projects
Rail2026
Botley Road Interchange
Platform works and station access improvements, built across eighteen months of night possessions beside a live railway.
- Value
- £4.2m
- Possessions
- 38
- Location
- Oxford

Commercial2025
Osney Mead Innovation Quarter
Laboratory and office building for a science park operator, taken on a two-stage design and build contract.
- Area
- 4,600 m²
- Value
- £5.4m
- Location
- Oxford

Industrial2024
Headington Quarry Warehouse
Steel-framed distribution unit with 12m clear internal height, a fitted first-floor office and a 40-space yard.
- Area
- 2,800 m²
- Value
- £3.1m
- Location
- Headington
Start a project
Refurbishing a
building in use?
Occupied buildings are most of our refurbishment work. Tell us who has to keep working through it and we will phase the job around them.